Plan B will be conducting a generator load test at the SGS data centre. It is not envisaged that this test will affect customers, as the generator will supply power requirements during the test. Should the generator fail during the test period, UPS power will be provided while mains power is immediately restored.
Posted on
Dec 09, 2024 - 12:33 NZDT